Four heritage buildings on Avinguda d'Alacant — assembled, restored and repositioned into a scarce Mediterranean hospitality and residential portfolio.

€13.77M
Sponsor Budget
€19.0M
Target Exit
€5.23M
Value Creation
38.0%
Target ROI
2,809
Built Area
24 mo
Horizon
Investment Logic

Why this asset exists as an institutional opportunity

Assembly
Four fragmented heritage assets become one destination
Individual buildings consolidated into a unified hospitality and residential corridor under a single management platform.
4 assets • 2,809 m²
Entry Basis
Acquisition at 58% below market
Portfolio acquired at €1,723/m² versus Jávea market reference €4,072/m². Protected old-town supply creates inherent scarcity.
Source: market benchmark
Repositioning
Hospitality-led operating platform
Apart-hotel, signature restaurant, wellness spa, serviced residences and creative headquarters — integrated under the Jessica Bataille brand.
Portfolio strategy
Scarcity
Protected old-town fabric
Heritage designation limits new supply. Year-round old-town economics outperform seasonal coastal models. Irreplicable urban position.
Regulatory protection
Risk Structure
Risks identified with mitigation
Licensing, construction, heritage complexity, operations and exit valuation risks are openly structured and addressed.
Heritage Jávea — aerial view of the four buildings H8, H16, H11, H13 on Avinguda d'Alacant

Avinguda d'Alacant

H8 · H16 · H11 · H13 — Four buildings, one corridor
01

The centre is where things belong.

Avinguda d'Alacant is the historic gateway to Jávea's old town — a protected boulevard of 19th-century Mediterranean architecture connecting the port to the medieval centre. One of the last unrestored heritage corridors on Spain's Costa Blanca.

While beachfront property reflects a journey already traveled, heritage old-town assets represent the journey ahead — deeper roots, constrained supply, irreplicable character, and an appreciation curve that has barely begun.

Three forces converge: regulatory protection limits new construction, international demand for authentic year-round Mediterranean living accelerates, and old-town economics outperform seasonal coastal models. Heritage Jávea captures all three.

2,809
Square metres acquired
4
Heritage buildings
Heritage Jávea — satellite position in Jávea historic centre
Heritage Jávea — 4 minutes to the sea by bike
Mercado de Abastos — Jávea historic centre

Mercado de Abastos

Historic market
Church fortress wall — Jávea old town

The Fortress

14th century church wall
Palm tree and arches — Jávea historic centre

The Old Town

Tosca stone, arches, palm trees

Avinguda d'Alacant

Street-level view — the Heritage corridor
The Vision

What these walls become

Heritage rehabilitation, not renovation. Every intervention reveals what was already there — stone, light, permanence.

Heritage courtyard pool from above

The Courtyard

Tosca stone, Mediterranean garden, private pool
Living spaces

Living Spaces

Original arches, contemporary comfort
Master suite

Master Suite

Heritage meets quietude
Inner garden

Inner Garden

Olive tree, tosca, stillness
Restored facade

Restored

Every detail honoured
Design palette

The Palette

Stone, linen, light

Nolla Mosaic Tiles

Under a century of dust — Heritage 8, Est. 1875
The Experience

What it feels like to arrive

Courtyard pools behind heritage stone. Garden dining under old trees. The sound of water against handmade tiles.

"The best buildings are the ones that were already there. You just had to listen to what they wanted to become."
Jessica Bataille
The Portfolio

Four buildings, one vision

AssetAreaProgramme
H8
Heritage 8
Avinguda d'Alacant 8
833 m²Apart-Hotel & Signature Restaurant. 1875 manor, Nolla mosaics, tosca stone, garden & pool. View Plans →
H16
Heritage 16
Avinguda d'Alacant 16
694 m²Residences & Wellness. 3 apartments, duplex penthouse, spa, wellness club, communal garden & pool. View Plans →
H11
Heritage 11
Avinguda d'Alacant 11
696 m² + 502 m² plotsCreative Headquarters. Offices, material atelier, design gallery, residential artist loft. View Plans →
H13
Heritage 13
Avinguda d'Alacant 13
586 m² + 299 m²Gastronomic Destination. Restaurant, 2 double-height lofts, underground parking. View Plans →
Heritage 8
H8
Heritage 16
H16
Heritage 11
H11
Heritage 13
H13

Heritage Staircase

Wrought iron, hydraulic tiles, original structure
Project Evidence

Technical documentation by asset

Public previews are planning-stage architectural documents. They evidence the existing assets, distribution studies and rehabilitation scope. The final hospitality operating programme, licensing tracker and full technical annex are shared after investor qualification.

H8
Heritage 8
Avinguda d'Alacant 8 • 833 m² • Apart-Hotel & Signature Restaurant
Public Preview Floor Plans & Distribution
Proposed layout distributions
Planning-stage architectural preview • floor plans • garden & pool • 9.2 MB
The original title block reflects base rehabilitation documentation. The current investment programme is the hospitality-led apart-hotel and signature restaurant strategy.
H16
Heritage 16
Avinguda d'Alacant 16 • 694 m² • Residences, Wellness & Spa
Full Rehabilitation Project
White House — Architectural project
Floor plans • sections • elevations • distributions by floor
Editorial Presentation
White Residences & Spa — Design vision
Concept • materiality • spatial narrative
H11
Heritage 11
Avinguda d'Alacant 11 • 696 m² + 502 m² plots • Creative Headquarters • 8 documents
Existing Condition 1 doc
Survey
Current state — second floor & roof
Main Floor 2 docs
Floor Plans
Planta Principal — Distribution
Floor Plans
Planta Principal — Alternative
First Floor 2 docs
Floor Plans
Planta Primera — Distribution
Floor Plans
Planta Primera — Alternative
Second Floor & Mezzanine 3 docs
Floor Plans
Planta Segunda — Distribution
Materials
Planta Segunda — Materials specification
Floor Plans
Altillo — Mezzanine distribution
H13
Heritage 13
Avinguda d'Alacant 13 • 586 m² + 299 m² parking • Restaurant & Lofts
Full Project
Heritage 13 — Complete architectural project
Floor plans • sections • restaurant • lofts • parking

Selected documents are public previews. Full plans, licences and technical due diligence are shared only after investor qualification. Request Technical Annex →

Before Transformation

What lies beneath

Tosca stone walls, original timber beams, centuries of material memory. These are the bones that make Heritage Jávea irreplicable.

Tosca stone walls with original beams

Tosca Walls

Original stone structure — Heritage 8
Light on heritage walls

Material Memory

Centuries of layered construction

Light on Stone

Heritage staircase — natural light through tosca

The Window

Original heritage opening — waiting to be restored
Investment Thesis

The numbers

Disciplined capital deployment across acquisition, restoration and activation — with clear exit scenarios.

€13.77M
Total Sponsor Budget
€19.0M
Target Exit
€5.23M
Value Creation
38.0%
Target ROI
2,809
Built Area
24 mo
Horizon

Capital Deployment

ItemAmount
Asset Acquisition€4,839,704
Project Execution€458,000
Construction€7,600,000
Interior Design & Furnishing€730,000
Gardens & Landscaping€140,000
Total Sponsor Budget€13,767,704

Model assumes 100% equity investment and no financial leverage. Recoverable VAT excluded.

Exit Scenarios

Conservative Exit
€16.47M
19.6% ROI
Profit: €2.70M
Strategic Exit
€20–22M
45.3–59.8% ROI
Profit: €6.23–8.23M

Target figures are sponsor projections and subject to due diligence, permitting, execution and market conditions.

Unit Economics — Entry basis creates the spread

€1,723/m²
Acquisition Cost
vs. €4,072 market
€4,901/m²
Total Cost Basis
€5,863/m²
Conservative Exit
€6,764/m²
Institutional Exit
€7,120–7,832/m²
Strategic Range

All €/m² calculated on 2,809 m² built area. Sponsor projections subject to change.

Income Underwriting

A hold case beneath the exit thesis.

The investment thesis is supported not only by a target portfolio exit, but also by an operating-income framework. A proposed sponsor/operator lease scenario creates a visible gross income basis, while a conservative hospitality scenario demonstrates resilience under moderate occupancy assumptions.

Hospitality Conservative
€469.2K /year
3.48%
Gross yield on €13.5M basis
50% annual occupancy • 26 occupied weeks • Conservative assumption
Stabilised Upside
€615K–742.5K /year
4.6%–5.5%
Gross yield on €13.5M basis
65–70% occupancy + revenue management • Illustrative upside, subject to performance

Proposed Lease Rent Roll

AssetOperating AssumptionAnnual Income
H163 apartments + cowork, €8,850/month€106,200
H13Restaurant + 2 apartments, €8,100/month€97,200
H11Restaurant + floors 1–2, €9,800/month€117,600
H8 Apartments9 apartments at 50% occupancy€187,200
H8 RestaurantRestaurant lease, €3,500/month€42,000
TotalProposed portfolio income€550,200
H16 — Rent Breakdown €8,850/mo
Apartment, 2nd floor luxury€2,950/mo
Apartment, 1st floor€2,800/mo
Ground-floor apartment€1,600/mo
Cowork space€1,500/mo
H13 — Rent Breakdown €8,100/mo
Restaurant€2,800/mo
Apartment€2,800/mo
Apartment€2,500/mo
H11 — Rent Breakdown €9,800/mo
Ground-floor restaurant€4,500/mo
First floor€2,800/mo
Second floor€2,500/mo
H8 — Income Breakdown €229,200/yr
9 apartments at 50% occupancy€187,200/yr
Restaurant lease, €3,500/mo€42,000/yr

Income Scenario Matrix

ScenarioAnnual Gross IncomeGross YieldWhat it demonstrates
Proposed Lease€550,2004.08%Income support / lease-backed hold case, subject to signed documentation
Conservative Hospitality€469,2003.48%Resilience at 50% occupancy / 26 weeks
Stabilised Upside€615K–742.5K4.6%–5.5%Potential upside through occupancy and revenue management

Why this matters

Income support
The investment is not dependent only on a sale scenario.
Hold optionality
Investors can evaluate income and exit routes separately.
Operator alignment
The Jessica Bataille platform supports brand, activation and guest experience.
Upside optionality
Conservative assumptions leave room for revenue management and seasonal pricing.
Request full operating model

Gross yields are calculated on a €13.5M valuation basis and before taxes, operating expenses, financing, maintenance, management fees and investor-specific structuring. The sponsor/operator lease scenario is subject to final lease documentation. Hospitality scenarios are sponsor projections and depend on licensing, operational execution, occupancy, pricing and market conditions.

From the Rooftops

Mediterranean Sea — 4 minutes away
Risk & Mitigation

Risk is not avoided. It is structured.

RiskDescriptionMitigation
Licensing
Timing and administrative sequencing across four heritage assets.
Project-by-project licensing tracker and active ECUV / Ayuntamiento coordination.
Construction
Execution complexity across four simultaneous rehabilitation sites.
Phased deployment, controlled scope and experienced technical oversight.
Heritage
Historic rehabilitation and structural sensitivity of protected buildings.
Specialist architectural review and dedicated heritage assessment.
Operations
Hospitality model must be clearly defined before asset activation.
Operating model for reception, F&B, housekeeping and guest experience.
Exit Valuation
Portfolio premium must be demonstrated to institutional buyers.
Completion, operational integration, scarcity, brand positioning and buyer universe.
Heritage Jávea — four assets highlighted on Avinguda d'Alacant Aerial view Heritage Jávea
Strategic Position

Four assets on the same axis

The four buildings sit on both sides of Avinguda d'Alacant — Jávea's historic boulevard connecting the port to the old town. This creates a unique advantage: the ability to activate an entire urban corridor, not just individual assets.

Heritage protection limits new construction. The old town offers year-round footfall versus seasonal coastal dependency. Acquisition at €1,723/m² — a 58% discount to Jávea's market average.

2,809 m²
Total built area
2,676 m²
Total land area
-58%
vs. market price
Protected
Heritage status
Capital Deployment

Capital deployment across 2026–2028

2026
Phase I — Acquisition & Design
€5,297,704
    Portfolio acquisition completedArchitectural projects & licencesHeritage assessment & engineeringInterior design master plans
2027
Phase II — Construction
€3,870,000
    Structural restorationInfrastructure & MEP systemsHeritage facade restorationCommercial fit-out begins
2028
Phase III — Completion
€4,600,000
    Interior design & furnishingGardens, landscaping & poolOperator agreementsAsset monetisation or hold
The Team

Built by the people who belong here

Heritage Jávea is led by Jessica Bataille The Lifestyle Company — rooted in Jávea since 2004. Over two decades restoring Mediterranean heritage. Local authorship. Institutional execution.

Jessica Bataille

Founder, CEO & Creative Director
20+ years in Mediterranean interior design. 60+ completed renovation projects in Jávea and Costa Blanca. The creative vision behind Heritage Jávea.

Jean Clauteaux

General Manager & COO
Strategy, capital structure, operations. Leads investor relations and project execution across the Heritage portfolio.
Supporting Team — Operations, Architecture, Engineering & Construction

Reyes Faulo

Director of Club Operations & Member Experience
Hospitality activation, member services and guest experience.

Natalia Perez Linde

Experience Curator
Living experience, programming and cultural identity.

Jerome Wepierre

Creative Designer
Visual identity, spatial design and brand expression.

Tom Jaring & Marie Reverret

Auténtico — Architecture
Lead architects. Heritage restoration and contemporary intervention.

Jaume Miralles

Architecture
Building assessment, licencing and project coordination.

Vicente Benet

Architecture
Structural design, heritage compliance and documentation.

Datec Ingeniería

Engineering
Structural engineering and technical oversight.

CRAFT Builders

Construction Partner
High-end residential and hospitality renovation.

Bersife

Construction Partner
Mediterranean residential construction and heritage restoration.

Heritage Jávea brings together four historic buildings
into a single long-term hospitality platform in one of the
Mediterranean's most protected urban settings.